ADU Company in Upland, CA
Kitchen remodeling in Upland usually means working inside a 1940s-to-1960s ranch or bungalow, where the original footprint was built around a small, closed-off kitchen and the panel hasn’t been touched since the Johnson administration. We handle the full scope: layout changes, electrical and plumbing upgrades, new cabinetry, countertops, and finishes – all sized to how Upland homes actually behave in the inland heat. Orchard ADU Builders has served Upland since 2013, and we also build ADUs and remodel bathrooms across the same properties. Call (844) 386-2399 for a free estimate on any of it.
Why Upland Homes Are Different
Upland is an older, largely built-out foothill city. Most of the work we do here happens behind mature single-family homes in ZIP codes 91784, 91785, and 91786 – not in new subdivisions where the builder already planned for a second unit. The pre-1970s tracts north and south of Foothill Blvd were platted when a kitchen was a closed room with one phone jack and a fuse box down the hall. Lot coverage, setback rules, and whether the rear alley actually gives a contractor access are the things that decide what’s possible, not the design catalog.
The housing stock runs heavily to stucco-over-wood-frame ranch and bungalow homes from the 1940s through the 1960s. Those houses sit on generous lots, often with detached garages, but the electrical service is frequently an older single-panel setup with no headroom. When we remodel a kitchen in Upland, we’re routinely adding circuits, upgrading the panel, and pulling new wiring before a single cabinet goes in. That’s not a surprise cost we spring on you – it’s the ordinary starting condition of a house this age.
Climate matters too. Upland sits at the base of the San Gabriel foothills, which means real summer heat and Santa Ana wind events, not coastal mildness. Kitchens here need ventilation that actually moves hot air out, and ADUs need cooling loads and shading designed for 100-degree weeks. We build for the inland reality, not a generic Southern California assumption.
Our Main Upland Services
Most homeowners who call us in Upland are weighing two projects at once: adding an ADU to a deep rear lot, and modernizing the main house so it doesn’t feel forty years behind the new unit. Here’s how each one works here.
ADU Builders in Upland
The typical Upland ADU is a garage conversion or a rear-yard build reached by an alley approach, tucked behind a mid-century home on a deep lot. Panel capacity and sewer lines on the existing house usually determine whether the project pencils out, and we’ve worked through enough of these to know what the city’s reviewers will flag before you spend money on plans. We build with prefab platforms including Abodu and Cover, and also handle site-built approaches where the lot demands it. See ADU Builders in Upland for the full local breakdown.

Bathroom Remodeling in Upland
Bathrooms in Upland’s postwar homes tend to be tight – original five-foot-by-seven-foot layouts with cast-iron drain lines that have been in the ground since Eisenhower was president. We open walls carefully, replace old galvanized supply lines, and rebuild the room to handle modern fixtures without pretending the subfloor is still perfect. When you’re adding an ADU, it often makes sense to refresh the main bath at the same time, since the crew and the dumpster are already on site. Bathroom Remodeling in Upland covers the scope.

What happens when you call
- 1
A real person answersNo phone trees — you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Kitchen Remodeling in Upland
Kitchen remodeling in Upland most often means opening up a small, closed-off 1950s or 1960s kitchen in a ranch home, upgrading an undersized electrical panel, and rebuilding the room to handle both the inland heat and the way a family actually cooks now. The original kitchens in these houses were built for one cook and a wall phone – not for an island, a second oven, or a refrigerator that needs a dedicated circuit. We plan the remodel around those realities from the first walkthrough, which is why we start with the house, not a showroom. For a broader look at the service, see Kitchen Remodeling.
Full Kitchen Gut and Rebuild
Signs you need it
Your cabinets are delaminating at the corners, the floor slopes toward the back door, or you cannot run the microwave and the toaster at the same time without tripping a breaker.
What it costs in Upland
A full kitchen gut and rebuild in Upland typically runs $55,000 to $95,000 depending on cabinet grade, appliance package, and how much electrical and structural repair the old house needs.
How we do it
We strip the room to framing, address wiring and water lines, rebuild walls and floors to current code, then set cabinets, counters, appliances, and finishes in one continuous sequence.
Cabinet Refacing and Countertop Replacement
Signs you need it
The cabinet boxes are solid but the doors are worn, the finish is dated, and the counters have burns, chips, or seams that catch every crumb.
What it costs in Upland
Cabinet refacing with new counters in Upland typically runs $15,000 to $30,000, with the spread driven by door style and whether you choose quartz, granite, or a laminate top.
How we do it
We keep the existing cabinet boxes, replace doors and drawer fronts, install new hardware, and set the new countertops over a leveled and reinforced base.
What Kitchen Remodeling Costs in Upland
| Item | Typical range in Upland |
|---|---|
| Full kitchen gut and rebuild | $55,000 – $95,000 |
| Cabinet refacing and new countertops | $15,000 – $30,000 |
| Electrical panel and circuit upgrade | $3,000 – $8,000 |
Labor in Upland lands mid-range for the Inland Empire, but the age of the house is the real wildcard. A 1948 ranch with original wiring will push the number higher than the same footprint in a newer build. Every estimate is a written line-item quote before we start, so the number you approve is the number you pay.
How long does a kitchen remodel take in Upland?
Most full kitchen remodels in Upland run six to nine weeks from demo to final walkthrough. Cabinet refacing usually finishes in two to three weeks. Call (844) 386-2399 and we’ll give you a real timeline for your specific house.
Will the price change once work starts?
No. We quote the job with a written line-item estimate, and we don’t run change orders for conditions we should have caught in the walkthrough. If the wall inspection reveals something no one could see, we talk to you before any dollar moves. Call (844) 386-2399 for an exact quote.
Brands We Service in Upland
We work with the brands you’ve already researched – Abodu, Cover, and Dvele among them – plus James Hardie fiber-cement exteriors where the build calls for a durable, low-maintenance skin. Parts and materials for these systems are stocked through our regular suppliers in the Inland Empire, so we’re not waiting on a truck from out of state. Our brands page covers what we build with and why.
Pricing for ADU Company in Upland, CA
| Service | Typical range in Upland |
|---|---|
| Full kitchen gut and rebuild | $55,000 – $95,000 |
| Cabinet refacing and new countertops | $15,000 – $30,000 |
| Electrical panel and circuit upgrade | $3,000 – $8,000 |
| Detached garage conversion to ADU | $120,000 – $220,000 |
| Prefab ADU (turnkey) | $180,000 – $350,000 |
| Bathroom remodel (full) | $20,000 – $45,000 |
| Bathroom remodel (cosmetic) | $8,000 – $18,000 |
Upland prices get pushed up by panel upgrades, sewer line work, and rear-alley access that requires careful staging – all common on homes built before 1970. We give you a fixed, written line-item price before work begins, and we don’t change it after the fact.
Neighborhoods We Serve in Upland
We work across Upland’s established single-family neighborhoods, from the foothill-adjacent streets in the north end of 91784 through the mid-century tracts south of Foothill Blvd in 91785 and 91786. Most of our Upland projects are within a short drive of our Orange office, so we can usually get a crew to your property fast when the schedule is set.
- North Upland (91784)
- Downtown and Foothill Blvd corridor (91786)
- South Upland (91785)
- San Antonio Heights adjacent (91784)
- West end near Claremont border (91786)
Service Area – Cities Near Upland
Beyond Upland, our crews cover the surrounding foothill and valley communities. We’re in San Antonio Heights, CA where the lots get larger and the access steeper, Claremont, CA with its older village-core homes, Montclair, CA for postwar tract work, and Rancho Cucamonga, CA where newer subdivisions mix with older rural-feeling lots.
Serving Upland, CA — Our Local Coverage Area
We’re based in the Upland area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.
FAQs About ADU Company in Upland
After the walkthrough and signed estimate, we typically begin within two to four weeks, depending on permit review times with the city and our current schedule. Upland’s planning department has been responsive on ADU applications, but every house is different, so call (844) 386-2399 and we’ll give you a straight answer.
Yes. We pull every permit the job requires, schedule inspections, and do not do unpermitted work. Upland enforces building codes on ADUs and remodels, and we’d rather the inspector sign off than leave you holding a liability when you sell.
No. Orchard ADU Builders is based in Orange, CA, and we serve Upland plus the surrounding cities listed above. The drive is short enough that we treat Upland as local, not as a satellite job. Call (844) 386-2399 to confirm your address is in our service area.
What happens when you call
- 1A real person answersNo phone trees — talk to a local adu pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Upland Customers Say
"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."
— Sarah Kowalski"The kitchenette layout he suggested made better use of the space than the one on our original sketch."
— Christine Park"Garage conversion to a one bedroom unit. He handled the plans, the city submittal, and every round of corrections. Took six months from first meeting to final inspection and he never once made the permit process my problem."
— Diego Delgado